Timeline infographics

Put the whole story
on one line.

Give it the events. It orders them, shortens the labels to something readable at a glance, draws the spine, and marks where today sits — for a company history, a roadmap, or a subject that only makes sense chronologically.

Make a timeline free

Timeline

How the internet
got everywhere

  1. 1969

    First message sent between two computers

  2. 1989

    The web is proposed at CERN

  3. 2007

    The internet moves into a pocket

  4. 2026

    Two thirds of humanity online

Illustrative · Made with Infographic Generator AI

Four timelines, and what goes wrong with each

Company history

Founding, the pivot, the first big customer, the funding, today. Five to eight entries — a company history with twenty entries is an archive, not a story.

Watch out — Do not include an entry only because it was hard. Include it because it changed what happened next.

Product roadmap

What shipped, what is shipping, what is planned. Mark the boundary between done and promised clearly, and date the promises loosely.

Watch out — A roadmap read as a commitment is how a timeline becomes a complaint. Say “planned” on the sheet.

Project or campaign plan

Phases with owners and dates, so everybody looking at the wall knows what week the project is in.

Watch out — Show dependencies as an order, not as arrows crossing the page. If the arrows cross, it is a diagram, not a timeline.

A subject explained chronologically

The history of the internet, of a treaty, of a disease. The classic educational timeline, and the one people share most.

Watch out — Cite the dates. A shared timeline that gets a date wrong travels further than the correction.

Five rules that separate a timeline from a list with dates on it

  1. 01

    Space by importance, not by elapsed time

    Ten quiet years and one decisive month should not get space in proportion to their length — unless the passage of time is itself the point, in which case say so on the sheet.

  2. 02

    Four to eight entries

    Below four, a timeline is a list. Above eight it becomes a scroll, and the reader loses the shape that made the format worth using.

  3. 03

    One line per entry

    The label is a headline, not a summary. If an entry needs three lines, it wants its own sheet.

  4. 04

    Date format consistent, and specific enough

    Years for decades of history, months for a year of a project. Mixing “2019” with “14 March” makes the reader do conversion work.

  5. 05

    Mark the present

    Every timeline that runs to today should show where today is. Without it, a reader cannot tell history from plan.

Timeline questions

What do I have to give it?

A list of events with dates, in any form — bullet points, a paragraph of history, a spreadsheet with a date column, or a document that contains the sequence. It will order them and shorten the labels.

Can I make the timeline horizontal?

Choose the wide shape for a horizontal spine suited to slides, or portrait for a vertical spine that reads well on a phone and prints on A4.

How many events can it hold?

Technically many, usefully four to eight. If you have thirty, split them into eras and make one sheet per era, or make one sheet of the eras themselves.

Can I mark future events differently?

Yes — ask for the planned entries to be shown as planned and they are drawn distinctly from the ones that have happened.

Can I use my brand colours?

Yes. Save a brand kit and the spine, nodes and labels are all drawn in your palette.

What can I export?

PNG, SVG or PDF, or a share link. SVG is the one to pick if the timeline is going on a wall — it stays sharp at any size.